
Remove and rebuild an aging, unsafe or poorly configured deck with new framing, decking, railings and stairs.
Replacement is an opportunity to correct original design limitations. You can change the deck footprint, add or remove stairs, raise or lower the deck height, switch from wood to composite, upgrade railing style, add lighting, improve under-deck drainage and address long-standing layout problems that repairs cannot fix.
The existing deck is removed down to the footings. Existing concrete piers are evaluated — they may be reusable if they meet current depth and diameter requirements and show no signs of settlement or cracking. All demolition debris is removed from the site.
New footings are installed to code-required depth. The framing system — posts, beams, joists and blocking — is designed for the new deck configuration. The ledger connection to the house is rebuilt with approved fasteners and properly flashed to prevent water intrusion.
New decking is installed according to manufacturer specifications with appropriate fastener patterns and spacing. Railings are built to meet guard height, baluster spacing and handrail requirements. Stairs are designed with consistent rise and run, proper stringer attachment and stable landings.
Most Connecticut deck replacements require a building permit. We coordinate the permit application, schedule required inspections and manage the construction timeline. Engineering review may be required for decks over certain heights, unusual configurations or special loading conditions.
Yes, in most Connecticut towns, any deck that attached to the house or is over 30 inches off the ground requires a building permit. Don't worry, we handle all the permit paperwork and inspections for you.
Composite decking (like Trex or TimberTech) is highly recommended for Connecticut weather because it resists moisture, mold, and doesn't splinter. However, pressure-treated wood or cedar are excellent, cost-effective options if you are willing to keep up with bi-annual staining.
Yes! If your deck's underlying structure (joists, beams, and ledger board) is sound and properly flashed, we can perform a 'deck resurfacing.' This saves you thousands of dollars while giving you a brand-new looking deck surface and railings.
Small repairs can often be done in 1-2 days. A surface replacement might take 3-5 days. A complete custom build can take 1-3 weeks once permits are approved and materials are delivered.
2–4 weeks for typical replacement
Every proposal defines the included work, project assumptions, selected materials, pricing and next steps.
Connecticut-registered home improvement contractor. Fully insured. Written project scopes. Repair, resurfacing and replacement options.